This procedure ensures that all machine power supplies meet required voltage tolerances. Measurements are taken with a calibrated meter to confirm proper electrical performance and system reliability.
AT24-08 Monthly Calibration
Calibration Procedure
40. Measure the voltage at 109PS 24.00vdc power supply. (23.8vdc - 24.2vdc)
Meter name
Unit
50. Measure the voltage at 113PS 24.00vdc power supply. (24vdc - 24.4vdc)
Meter name
Unit
60. Measure the voltage at 117PS 12.00vdc power supply. (11.8vdc - 12.3vdc)
Meter name
Unit
70. Inside the station #7 enclosure measure the voltage between the GND connection and positive 12vdc power connection. (11.8vdc - 12.2vdc)
Meter name
Unit
80. Measure the voltage between the GND connection and positive +5vdc power connection. (4.9vdc - 5.3vdc)
Meter name
Unit
90. Measure the voltage between the GND connection and positive 6.2vdc power connection. (6vdc - 6.4vdc)
Meter name
Unit
100. Inside the station #9 enclosure measure the voltage between the GND connection and positive 12vdc power connection. (11.8vdc - 12.2vdc)
Meter name
Unit
110. Measure the voltage between the GND connection and positive +5vdc power connection. (4.9vdc - 5.3vdc)
Meter name
Unit
120. Measure the voltage between the GND connection and positive 6.2vdc power connection. (6vdc - 6.4vdc)
Meter name
Unit
170. Enter the ID# of the voltage meter that was used.
180. Sign Off
Click here to sign