Mash Tun Packing Install
Mash Tun Packing Install / Replacement
Mash Tun Packing Install
Mash Tun Packing Install / Replacement
1 - LOTO Safety Maintenance Checklist
Lock out/Tag Out procedures are to be completed before any service or maintenance work on equipment or machinery, and/or before entry into any other area where operating equipment poses a hazard to the entrant.
General Lockout Steps and Instructions:
Notify Employees
Review Procedures
Shutdown Equipment
Disconnect & Isolate the Energy Source
Lockout Controls
Release Energy
Try out
Lockout Release Steps
Inspect Equipment
Check Area
Check Controls
Re-energize
Notify Employees
Startup Equipment
SPECIFIC LOTO INSTRUCTIONS
Company Name:
Equipment ID:
Description:
Facility:
Location:
Date Created:
Person:
Date Revised:
Person:
Lockout Points (Picture of lockout points goes here)
Add or drag pictures
Identify where the lock out points are located. (Picture of lockout points goes here)
Add or drag pictures
Any machine modifications must be shown in this procedure. Contact facility manager to update this procedure. Always perform a machine stop before locking out disconnects
Energy Source:
Device used to De-energize:
Location:
Method:
Try Out Check to Verify Equipment is De-energized:
Preconditions
Procedure
1 - Food Safety Maintenance Checklist
Food Safety - Ensure all of the following items are completed prior to placing the asset back into service
Click here to sign
Source: FIFCO-USA Rochester (Community Member)