Emergency Maintenance (FRAMETEQ F-500 Nail guns)
You will see all the necessary things that need to be done for the emergency maintenance of your FrameTQ F-600 Nail guns. The failure will occur in the middle of the process. The following points will describe why it is not ideal to do the LOTO: (1) We will be in the obligation to send the unfinished wall to the next station for a manual assembly. (2) So for two failures for example ,we will be loosing a lot of time because of the shutdown time and the manual assembly.
Emergency Maintenance (FRAMETEQ F-500 Nail guns)
You will see all the necessary things that need to be done for the emergency maintenance of your FrameTQ F-600 Nail guns. The failure will occur in the middle of the process. The following points will describe why it is not ideal to do the LOTO: (1) We will be in the obligation to send the unfinished wall to the next station for a manual assembly. (2) So for two failures for example ,we will be loosing a lot of time because of the shutdown time and the manual assembly.
Procedure Max Score: 31
Health and Safety
Emergency maintenance
Inspection after work
Technician Signature
Click here to sign
Source: ABIC (Community Member)