AHU Annual Inspection and Maintenance.

This annual inspection form is used to check the safety of your equipment ensuring that it does not post any hazard on anyone while in use.
Mt. Dora - Curaleaf
05/18/2023

AHU Annual Inspection and Maintenance.

This annual inspection form is used to check the safety of your equipment ensuring that it does not post any hazard on anyone while in use.

    Initial Site/Safety Survey

    Please Complete the Check Boxes on all work

    Site Safety Survey

    Safety Survey

    Lock Out Tag Out (Standard). Time - 9 min.

    Click here to sign

    OSHA - LOTO Print to Fill Form

    Requirements:

    General Information:

    This is a Microsoft Word file that can be printed and filled out.

    The content is arranged in a table format and can be edited in Microsoft Word.

    This form is made to print and fill out by hand for those not comfortable filling it out on the computer.

    Instructions:

    LOTO PROCEDURES

    Company Name

    Lock out/Tag Out procedures are to be completed before any service or maintenance work on equipment or machinery, and/or before entry into any grain bin or other area where operating equipment poses a hazard to the entrant. Failure to follow proper lockout-tag out procedures may result in disciplinary action up to and including termination.

    General Lockout Steps

    Steps & Instructions

    Additional Information

    Lockout Release Steps

    Steps & Instructions

    SPECIFIC LOTO INSTRUCTIONS

    Company Name

    Equipment ID:

    Description:

    Facility:

    Location:

    Date Created:

    Person:

    Date Revised:

    Person:

    # 1 Lockout Points Identify where the lock out points are located.

    Picture of lockout points goes here.

    Add or drag pictures

    Picture of lockout points goes here.

    Add or drag pictures

    # 2 Lockout Instructions Follow the lock out instructions below.

    Energy Source

    Device used to De-energize

    Location

    Method

    Try Out Check to Verify Equipment is De-energized

    SPECIAL INSTRUCTIONS

    1.

    2.

    3.

    Reference: Typical minimal lockout procedure – 29 CFR 1910.147 App. A Enforcement: Failure to follow proper lockout-tag out procedures may result in disciplinary action up to and including termination.

    SAFETY IS YOUR RESPONSIBILITY – LOCK IT OUT!

    Check Electrical Connections/Inspect all. Time - 20 min. Please list any issues found below.

    Supply Fan Inspection. Time - 20 min. Please list any issues below.

    Verify Incoming Voltages. Time - 5 min. Please list voltages below.

    Verify Operating Voltages. Time - 5 min. Please list voltages below.

    Measure Amperage of Motor. Time - 5 min. Please list Amperage berlow.

    Check Controller Operation. Time - 10 min. Please list any issues below.

Source: Mt. Dora - Curaleaf (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.