Back

Railcar Pre-Unloading Checklist

This procedure is used to verify railcars are blocked, braked, and protected before unloading so product transfer starts only when safeguards are in place.
Ergon -
03/23/2026

Railcar Pre-Unloading Checklist

This procedure outlines the pre-unloading inspection of railcars at an unloading track to confirm they are secured and ready for safe product transfer. It guides the operator through checking the dome lid, placarding, wheel chocks, hand brakes, the blue stop sign, and the derailers, then recording each car’s number, track position, inspection due date, and the fittings, valves, and pins, followed by the operator’s signature.

    Date

    Dome Lid Open

    • Yes
    • No
    • N / A

    Placarding

    • Pass
    • Flag
    • Fail

    Wheel Chocks Installed

    • Yes
    • No
    • N / A

    Hand Brakes Engaged

    • Yes
    • No
    • N / A

    Blue "Stop Tank Car Connected" Sign In Place

    • Yes
    • No
    • N / A

    Portable Derailer In Place (10 Ft Away from Last Car)

    • Yes
    • No
    • N / A

    Main Derailer in Place

    • Yes
    • No
    • N / A

    4134 Rail Cars

    Car Number

    TRACK Position

    Inspection Due Date

    Fittings/Valves/Pins Capped and in Place

    • Pass
    • Flag
    • Fail

    Car Number

    TRACK Position

    Inspection Due Date

    Fittings/Valves/Pins Capped and in Place

    • Pass
    • Flag
    • Fail

    Car Number

    TRACK Position

    Inspection Due Date

    Fittings/Valves/Pins Capped and in Place

    • Pass
    • Flag
    • Fail

    Car Number

    TRACK Position

    Inspection Due Date

    Fittings/Valves/Pins Capped and in Place

    • Pass
    • Flag
    • Fail

    Car Number

    TRACK Position

    Inspection Due Date

    Fittings/Valves/Pins Capped and in Place

    • Pass
    • Flag
    • Fail

    Car Number

    TRACK Position

    Inspection Due Date

    Fittings/Valves/Pins Capped and in Place

    • Pass
    • Flag
    • Fail

    Car Number

    TRACK Position

    Inspection Due Date

    Fittings/Valves/Pins Capped and in Place

    • Pass
    • Flag
    • Fail

    Car Number

    TRACK Position

    Inspection Due Date

    Fittings/Valves/Pins Capped and in Place

    • Pass
    • Flag
    • Fail

    Car Number

    TRACK Position

    Inspection Due Date

    Fittings/Valves/Pins Capped and in Place

    • Pass
    • Flag
    • Fail

    Car Number

    TRACK Position

    Inspection Due Date

    Fittings/Valves/Pins Capped and in Place

    • Pass
    • Flag
    • Fail

    Signature Operator

    Click here to sign
Source: Ergon - (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.