MTN 042 Retail line 6 monthly PM
MTN 042 covers the scheduled monthly preventive maintenance activities for Retail Line 6 to ensure optimal performance, reliability, and safety. This procedure includes inspecting mechanical and electrical components, cleaning and lubricating moving parts, tightening loose fasteners, checking safety devices, and verifying proper operation of sensors, belts, motors, and control systems. Any worn or damaged parts are identified for repair or replacement. The monthly PM aims to minimize unplanned downtime, maintain product quality, and extend equipment lifespan through proactive care following a standardized checklist.
MTN 042 Retail line 6 monthly PM
MTN 042 covers the scheduled monthly preventive maintenance activities for Retail Line 6 to ensure optimal performance, reliability, and safety. This procedure includes inspecting mechanical and electrical components, cleaning and lubricating moving parts, tightening loose fasteners, checking safety devices, and verifying proper operation of sensors, belts, motors, and control systems. Any worn or damaged parts are identified for repair or replacement. The monthly PM aims to minimize unplanned downtime, maintain product quality, and extend equipment lifespan through proactive care following a standardized checklist.
Cartoning Compact 4/S
Little David Case Sealer
work completed by
Click here to sign
Source: dalesman (Community Member)