Back

Weld Cell Gas Leak Test

A structured gas leak test of the weld cell to inspect and verify the integrity of all gas supply connections, fittings, and regulators, ensuring a safe and properly sealed system prior to welding operations and in compliance with applicable safety requirements.
Victaulic - Atlanta Manufacturing
02/27/2026

Weld Cell Gas Leak Test

This procedure outlines the requirements for performing gas leak testing on all gas line connections within designated weld cells. It ensures that fittings, manifolds, robotic systems, and associated equipment are inspected for leaks to maintain safe operation and prevent hazardous gas exposure.

    Fitting Weld Cells 6-9

    • Pass
    • Flag
    • Fail

    Tacking Weld Cells 10A & 10B

    • Pass
    • Flag
    • Fail

    Manifold Weld Cells 1-3

    • Pass
    • Flag
    • Fail

    Lincoln Robot and Cobot

    • Pass
    • Flag
    • Fail

    Header Weld Cells 1 & 2

    • Pass
    • Flag
    • Fail

    BSSC Weld Cells 1-4 & Autoweld (5)

    • Pass
    • Flag
    • Fail
Source: Victaulic - Atlanta Manufacturing (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.