Back

RM Plant - WATER PUMP FIR INSPECTION

This procedure is used to inspect the RM plant water pump and motor and to flag any leaks, wear, or abnormal operation for repair.
SOVA - RMC - Titan America
03/11/2026

RM Plant - WATER PUMP FIR INSPECTION

This procedure outlines the inspection of the RM plant water pump and motor to confirm they are running safely and reliably. It guides the inspector through checks of noise, motor mounting, alignment and coupling, rubber elements, valves, piping and seals, instrumentation, and safety guards and signs.

    Check for unusual noise

    • Pass
    • Flag
    • Fail

    Check motor fixation

    • Pass
    • Flag
    • Fail

    Check the alignment

    • Pass
    • Flag
    • Fail

    Check the rubber elements

    • Pass
    • Flag
    • Fail

    Check water valves operation and check for leakages

    • Pass
    • Flag
    • Fail

    Check the inlet and discharge pipes and check the pump seals for leakages

    • Pass
    • Flag
    • Fail

    Check the instrumentation and gauges

    • Pass
    • Flag
    • Fail

    Check all the safety guards and signs

    • Pass
    • Flag
    • Fail

    Check the coupling alignment

    • Pass
    • Flag
    • Fail
Source: SOVA - RMC - Titan America (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.