Back

AVH18-04 Monthly Calibration

This procedure ensures all machine power supplies and control functions operate within specified tolerances. Measurements are taken using a calibrated meter to verify accuracy and system performance.
TAC Manufacturing
12/10/2025

AVH18-04 Monthly Calibration

    Calibration Procedure

    40. Measure the voltage at 24.00vdc power supply. (23.9vdc - 24.3vdc)

    • AVH18-0440.PNG
    Meter name
    Unit

    50. Measure the voltage at 12.5vdc power supply. (12.3vdc - 12.7vdc)

    • AVH18-0450.PNG
    Meter name
    Unit
    • AVH18-0460.PNG
    • AVH18-0470.PNG
    • AVH18-0480.PNG
    • AVH18-0490.PNG

    100. As you push the P, R, N, D, and S buttons compare the actual readings on the HMI with the readings on your meter.

    • AVH18-04100.PNG
    • Pass
    • Flag
    • Fail

    140. Enter the ID# of the voltage meter that was used.

    150. Sign Off

    Click here to sign

Source: TAC Manufacturing (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.