BREAKDOWN/FAULT REPORT

Use this procedure for proper documentation of your machine findings and inspection.
Kiss Baking Jamaica
07/17/2023

BREAKDOWN/FAULT REPORT

Use this procedure for proper documentation of your machine findings and inspection.

    Date and Start Time:

    Completion Time

    Equipment Name: (Also select the equipment Under Asset)

    Operator:

    Shift:

    Run hour for Machine with Fault (Leave blank if machine has no Meter)

    Meter name
    Unit

    Downtime (min)

    Fault Description/Symtoms/Problem Summary:

    Photo of Fault (where applicable)

    Add or drag pictures

    State the Issue reported by Production:

    RESULTS OF FAILURE:

    Repair Description/Diagnostic steps performed (to include troubleshooting steps):

    Corrective Actions performed:

    Root Cause (Ask yourself the 5WHY’s):

    Recommendations (failure prevention & long-term action):

    Permanent fix to Fault? Any Repair that requires follow up Please mark Fail and add a comment.

    • Pass
    • Flag
    • Fail

    DONE BY: SIGNATURE

    Click here to sign

    DONE BY: SIGNATURE

    Click here to sign
Source: Kiss Baking Jamaica (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.