Weekly Die PM - 4-Out
This procedure outlines the required weekly preventive maintenance inspection for 4-out dies to verify condition, functionality, cooling, lubrication, and safety. All findings, corrective actions, and follow-up requirements must be documented upon completion.
Weekly Die PM - 4-Out
Section #1 - Initial Inspection
1a. Overall Die Condition
1b. Visible Die Damage Present
if the answer is "oneOf [Yes]"
1c. If damage present, describe
1d. Safety Concerns Identified
if the answer is "oneOf [Yes]"
1e. Safety concern description
Section #2 - Die Usage
2a. Current Stroke Count
Meter name
Unit
2b. Estimated Strokes Since Last PM
2c. Abnormal Die Usage Observed
if the answer is "oneOf [Yes]"
2d. Usage concern description
Section #3 - Water & Cooling (Die)
3a. Water Leaks Present at Die
if the answer is "oneOf [Yes]"
3b. Leak Location
if the answer is "oneOf [Upper Die,Lower Die,Water Fittings,Hoses,Other]"
3c. Corrective Action Taken
3d. Leak Fully Resolved
Section #4 - Die Lubrication
4a. Die Lubrication Operating Normally
4b. Lube Lines / Ports Clear
if the answer is "oneOf [No]"
4c. Lubrication Issues Noted
Section #5 - Mechanical Die Condition
5a. Loose or Missing Fasteners
if the answer is "oneOf [Yes]"
5b. Wear Location
5c. Mechanical Issues Requiring Follow-Up
Section #6 - Sensors & Die Controls
6a. Die Sensors Secure and Aligned
6b. Sensor Cables / Connections Intact
6c. Sensor or Control Issues Identified
if the answer is "oneOf [Yes]"
6d. Issue Description
Section #7 - Die Safety Features
7a. Die Safety Blocks / Stops in Place
7b. Guards / Shields Secure
7c. Safety Issues Identified
if the answer is "oneOf [Yes]"
7d. Safety Issue Description
Section #8 - Die Housekeeping
8a. Die Clean and Free of Debris
8b. Excess Oil / Water Accumulation
8c. Housekeeping Corrected During PM
Section #9 - Corrective Actions Taken
9a. Corrective Actions Performed During PM
if the answer is "oneOf [Yes]"
9b. Corrective Action Description
9c. Parts Replaced or Adjusted
Section #10 - Follow-Up Required
10a. Additional Work Required
if the answer is "oneOf [Yes]"
10b. Follow-Up Description
if the answer is "oneOf [Yes]"
10c. Work Order Issued
Section #11 - Photos & Documentation
11a. Photos Uploaded
Add or drag pictures
11b. Additional Notes
Section #12 Technician Sign-Off
12a. Technician Name
Click here to sign
12b. Date Completed
12c. Comments