Winter Shutdown Procedure
This procedure is used to shut down each lift at the end of the winter season so equipment is protected, pests are kept out, and the lift is ready for the next operating season.
Winter Shutdown Procedure
This procedure outlines the end-of-winter shutdown of a ski lift, covering the drive terminal mechanical and electrical systems, engine fuel, general cleaning of both terminals and the lift shack, and the return terminal. It guides the technician through greasing, fluid checks, fuel handling by engine type, heater shutdown, rodent prevention, cleanup, inventory, a final lift inspection, and a grease sample from the bullwheel.
Drive Terminal Mechanical
Gas or Diesel EVAC
if the answer is "oneOf [Diesel ]"
if the answer is "oneOf [Gas ]"
Drive Terminal Electrical
If heater can only be shut off via breaker, isolate power and disconnect heater completely. Make new work order to fix this condition
(LV ONLY, 480V PANELS MUST STAY CLOSED)
Replace covers, vacuum mouse droppings, remove anything that is not wiring.
General Both Terminals
Special attention to any food items
All dirty rags to shop. Clean up any grease/oil. Remove extra consumables (if there are 5 cans of brake cleaner, leave 1 take 4 back to shop). Organize tools, any tools that should live at the shop should go back to the shop. Organize parts, any parts that are Lift specific can stay at that lift, shared parts should go back to the shop. Parts in terminals should be inventoried.
Police area around terminal, lift shack and under lift shacks/decks. Any garbage should be thrown out
Return Terminal
Clean area where grease purges very well, once grease purges, collect sample in clean container and label. We will give these samples a basic "analysis"
Final
Notes
Lift Hours
Meter name
Unit
Source: Crotched - Lifts (Community Member)
