Back

Monthly Lift Inspection Checklist

This checklist outlines the required monthly inspection and preventive maintenance tasks to ensure lifts remain safe, reliable, and in good operating condition. All inspections, measurements, and corrective actions must be recorded upon completion.
Liberty Mountain - Lifts
01/07/2026

Monthly Lift Inspection Checklist

Monthly maintenance and inspection guide to ensure lifts are in good operational condition.

    Lift Hours

    Meter name
    Unit

    Grease & Lube

    Grease lift driveline componentry with proper grease specified by manual

    Task Log

    Date (MM/DD/YY) - EE Initials - "Task performed"

    Date Completed

    EE initials & Signature

    Click here to sign

    Component Inspection

    Verify condition, measure, test, and record findings.

    Prime mover (EM)

    Inspect motor brushes/springs & belt tension/alignment

    • Pass
    • Flag
    • Fail
    if the answer is "oneOf [FLAG,FAIL]"

    Corrective action taken/work performed

    Visually inspect tucks

    Repaint if needed - NO GRIPS ON TUCKS notify if within 4'

    • Pass
    • Flag
    • Fail
    if the answer is "oneOf [FLAG,FAIL]"

    Corrective action taken/work performed

    Guide sheaves adjustment

    Physically measure guide sheave alignment and adjust as needed. Monitor chairs entering and exiting bull wheel - ensure there is NO ROPE TWIST

    • Pass
    • Flag
    • Fail
    if the answer is "oneOf [FLAG,FAIL]"

    Corrective action taken/work performed

    Date Completed

    EE initials & signature

    Battery Load Test

    Perform load test - verify battery voltage before, during the load, and after the load test. Note the condition of the battery and any corrective action taken. (Some lifts will not utilize all of these fields)

    24v Battery #1

    Before, During, After, Condition

    24v Battery #2

    Before, During, After, Condition

    Brake Battery #1

    Before, During, After, Condition

    Brake Battery #2

    Before, During, After, Condition

    APU Battery #1

    Before, During, After, Condition

    APU Battery #2

    Before, During, After, Condition

    Tension Battery #1

    Before, During, After, Condition

    Tension Battery #2

    Before, During, After, Condition

    Corrective action

    Date completed

    EE initials & signature

    Click here to sign

    Monthly inspection notes

    Date (MM/DD/YY) - EE Initials - "corrective action/notes related to monthly inspection"

    Supporting content

    Add or drag pictures
Source: Liberty Mountain - Lifts (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.