Portable Water Tank Trailer Preventive Maintenance
This procedure outlines the preventive maintenance steps for the Portable Water Tank specific maintenance actions to ensure optimal performance and longevity of the Portable Water Tank Trailer.
Portable Water Tank Trailer Preventive Maintenance
This procedure outlines the preventive maintenance steps for the Portable Water Tank specific maintenance actions to ensure optimal performance and longevity of the Portable Water Tank Trailer.
50 Hours / 3 Months
Run Equipment and Check for Unusaual Noises and Vibration
Inspect Trailer Frame for Damage
Check for Fluid Leaks
Check Oil Level Topoff as Required
100 Hours / 6 Months
Inspect Spark Plug
Clean Spark arrestor
Clean Sediment Cup
Replace Fuel Filter
Check Wheel Nuts
Flush and Clean Water Tank
Inspect Inlet Hose
Inspect Discharge Hoses
Inspect Ball Valves
Completed By
Click here to sign
300 Hours / Year
Inspect Impeller
Check Impeller Clearence
Check Pump Inlet Valve
Competed On
Notes
Source: McGill Environmental - d (Community Member)
