MOP-019, Water Jet Daily Equipment Check, REV 0

This procedure explains in detail of how to do the daily check on the Water Jet Area.
PGT - Ellisville
12/14/2025

MOP-019, Water Jet Daily Equipment Check, REV 0

This daily check verifies water jet system performance nozzle speed/pressure, hydraulic and water systems, temperatures, and safety features to ensure safe, accurate operation and prevent downtime.

    Safety Dedication Section

    This section is dedicated to Safety, PPE, any required permits, any hazards and SDS's/JSA's required to complete this task. Safety is Job #1 - If it can't be done safely, don't do it! Ensure all necessary permits and procedures are in place.

    Permits Required.

    Signing here implies that the Maintenance Employee has read and comprehends the safety section of this procedure.

    Click here to sign

    Procedure Documentation

    This is a finalized and signed off copy of this procedure.

    Tools/ Equipment Section

    This section is dedicated to what tools, parts, fluids and so on that are required to complete this task.

    Equipment Required.

    Water Jet 1

    Nozzle Speed > 720 RPM

    • Pass
    • Flag
    • Fail

    Nozzle Speed

    Meter name
    Unit

    Pressure

    Meter name
    Unit

    Hours on the Machine

    Meter name
    Unit

    Pressure > 38K PSI

    • Pass
    • Flag
    • Fail

    Cabinet AC Temperature < 80 F

    • Pass
    • Flag
    • Fail

    Cabinet AC Temperature In F

    Meter name
    Unit

    Heat Exchanger Fluid Temp

    Meter name
    Unit

    Heat Exchanger Temp > 65.5 F

    • Pass
    • Flag
    • Fail

    Hydraulic Pump Pressure In Use > 2000 PSI

    • Pass
    • Flag
    • Fail

    Hydraulic Pump Pressure #1

    Meter name
    Unit

    Water Pressure > 100

    • Pass
    • Flag
    • Fail

    Water Pressure

    Meter name
    Unit

    Orifice Size < 15

    • Pass
    • Flag
    • Fail

    Orifice Size

    Meter name
    Unit

    Water Jet 2

    Nozzle Speed > 720 RPM

    • Pass
    • Flag
    • Fail

    Nozzle Speed

    Meter name
    Unit

    Pressure

    Meter name
    Unit

    Hours on the Machine

    Meter name
    Unit

    Pressure > 38K PSI

    • Pass
    • Flag
    • Fail

    Cabinet AC Temperature < 80 F

    • Pass
    • Flag
    • Fail

    Cabinet AC Temperature In F

    Meter name
    Unit

    Heat Exchanger Fluid Temp

    Meter name
    Unit

    Heat Exchanger Temp > 65.5 F

    • Pass
    • Flag
    • Fail

    Hydraulic Pump Pressure In Use > 2000 PSI

    • Pass
    • Flag
    • Fail

    Hydraulic Pump Pressure #1

    Meter name
    Unit

    Water Pressure > 100

    • Pass
    • Flag
    • Fail

    Water Pressure

    Meter name
    Unit

    Orifice Size < 15

    • Pass
    • Flag
    • Fail

    Orifice Size

    Meter name
    Unit

    Water Jet 3

    Nozzle Speed > 720 RPM

    • Pass
    • Flag
    • Fail

    Nozzle Speed

    Meter name
    Unit

    Pressure

    Meter name
    Unit

    Hours on the Machine

    Meter name
    Unit

    Pressure > 38K PSI

    • Pass
    • Flag
    • Fail

    Cabinet AC Temperature < 80 F

    • Pass
    • Flag
    • Fail

    Cabinet AC Temperature In F

    Meter name
    Unit

    Heat Exchanger Fluid Temp

    Meter name
    Unit

    Heat Exchanger Temp > 65.5 F

    • Pass
    • Flag
    • Fail

    Hydraulic Pump Pressure In Use > 2000 PSI

    • Pass
    • Flag
    • Fail

    Hydraulic Pump Pressure #1

    Meter name
    Unit

    Water Pressure > 100

    • Pass
    • Flag
    • Fail

    Water Pressure

    Meter name
    Unit

    Orifice Size < 15

    • Pass
    • Flag
    • Fail

    Orifice Size

    Meter name
    Unit

    AGB 7

    Grit Barrell

    Pressure < 75 PSI

    • Pass
    • Flag
    • Fail

    Air Pressure

    Meter name
    Unit

    Hours on the Machine

    Meter name
    Unit

    Work Completion, Production Notification, Cleanup and Task Signoff

    This section is dedicated to cleaning the area where you have worked, put away any tools that were needed for the task, have you removed any trash that is a product of the task being performed? Have all protective safety guards been reinstalled? Signing in this signature block means that the maintenance employee has cleaned all messes associated with the work, reinstalled all safety guards, stowed away all tools and ensures that the task is complete. Has the maintenance employee notified production that the work is finished and released back into service?

    Signing here implies that the Maintenance Employee has read and comprehends the Work Completion, Cleanup and Task Signoff section of this procedure.

    Click here to sign

    Date.

Source: PGT - Ellisville (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.