Quarterly Cooling Tower Pump Seal Inspection & Maintenance
By regularly replacing the seal and O-ring, you eliminate the most common cause of pump failure, this prevents catastrophic pump failure and unplanned kiln downtime by ensuring the cooling system remains leak-free and fully operational.
Quarterly Cooling Tower Pump Seal Inspection & Maintenance
By regularly replacing the seal and O-ring, you eliminate the most common cause of pump failure, this prevents catastrophic pump failure and unplanned kiln downtime by ensuring the cooling system remains leak-free and fully operational.
Inspection Date
Pump Operating Hours
Record current pump operating hours from display Record operating hours
Meter name
Unit
Confirm pump is shut down and locked out Check when shutdown and LOTO complete
Remove and Replace Mechanical Seal
Replace mechanical seal and O-ring as preventive maintenance
Seal Installation Photo
Document newly installed seal Attach photo of completed installation
Add or drag pictures
Pump Test Run
Run pump for 15 minutes and verify no leaks No leaks detected during test?
Inspection Completion Signature
Click here to sign
Source: Sohal Co (Community Member)
