Production Machine Tool SAMI Semi-Annual PM
This procedure outlines the semi-annual preventive maintenance tasks for the SAMI production machine tool. Follow manufacturer instructions and site isolation requirements, complete the applicable inspections and servicing, and document findings and required corrective actions.
Production Machine Tool SAMI Semi-Annual PM
The aim of this procedure is to maintain the SAMI production machine tool in reliable operating condition through preventive maintenance every six months. It helps identify wear, damage, lubrication issues, and developing faults, supporting consistent machining performance, reduced unexpected downtime, and extended equipment service life.
Lock Out Tag Out
LOTO Performed
Food Safety Pre-Check
Machine Observation
Check all mounts, bumper guards, and light covers.
Check counter beam alignment, and fiber optic sensor in the back. Check sensor alignment and integrity.
Make sure counter works properly.
Check lights for proper operation. Check for cracked or broken mirror.
Check adjustability.
Check quality of reflector strip.
Check cabinets; they should be clean and have all conductors neatly arranged. Check light fixture housings for grommets where the w Knicks in the wiring. Check power cord for cuts and Knicks. Also ensure Velcro is used to suspend power cord.
Clean Entire machine of Linen, dirt, debris etc. Touch up areas of rust and paint failure.
Clean sensor lenses.
Repair made or needed.
Food Safety Post-Check
Source: 24P DC Columbus - Cintas (Community Member)