Hull Pellet Mill Internal Inspection
This procedure ensures the pellet mill's internal components are inspected for wear, buildup, and misalignment to maintain safe, reliable operation and pellet quality.
Hull Pellet Mill Internal Inspection
This procedure covers the internal inspection of the hull pellet mill, checking roll corrugation, die wear, product scraper clearance, oil leaks, roller adjustment bolts, and roller-to-die contact, following LOTO and steam/water shutoff before opening the mill door.
Inspect roll corrugation.
Use percentage of corrugation left.
Inspect Die for wear
Die should be roughly 1/4" above flange ring on edge of die. If getting close or below ring, replacement is required.
Inspect product scrapers for wear and adjustment.
Scrapers should be adjusted to roughly 1/8" from the shell. Rotate die around to verify clearance.
Inspect behind die for leaking oil.
Verify that roller adjustment bolts are not seized in housing. Remove and re-antiseize.
Rotate die around by hand and verify rollers are set correctly.
Rolls should hit once maybe twice on die and nothing more. If die rolls the entire time, rollers are too tight.
Sign after completion of inspection and repairs