Weekly Production Area PM
This procedure is for the weekly checks needed to ensure production areas operate properly.
Weekly Production Area PM
This procedure is for the weekly checks needed to ensure production areas operate properly.
Robot Tooling- Ensure all tooling for robots are secure and in good condition.
Robot Vacuum Systems - Change vacuum cups as necessary and clean out vacuum system
Dust Collection Systems - Inspect ALL dust collection piping and pick up points for proper flow and operation
Source: 2730 ATLC - Custom Building Products (Community Member)