End of Shift - Emulsion
Follow this procedure to ensure all equipment mills, AC tanks, emulsion tanks, chemical tanks, hot water loop are closed and off at end of shift.
End of Shift - Emulsion
Follow this procedure to ensure all equipment mills, AC tanks, emulsion tanks, chemical tanks, hot water loop are closed and off at end of shift.
Operator
Mill
AC Tanks
Emulsion Tanks
Chemical Tanks
Hot water tank temp
Meter name
Unit
Hot Water Loop
Hot Water Loop Pump running?
Hot Water Loop Pump leaking?
Hot Water Loop Temperature
Meter name
Unit
Hot Water Loop Pressure
Meter name
Unit
Source: Ergon - Lubbock 14842 (Community Member)