Fanuc M-710ic 3-Month Inspection
The Fanuc M-710iC 3-Month Inspection involves a scheduled check of the robot’s mechanical, electrical, and safety systems to ensure optimal performance and early detection of wear or faults. Key tasks include inspecting joints, cables, lubrication levels, and controller diagnostics.
Fanuc M-710ic 3-Month Inspection
The Fanuc M-710iC 3-Month Inspection involves a scheduled check of the robot’s mechanical, electrical, and safety systems to ensure optimal performance and early detection of wear or faults. Key tasks include inspecting joints, cables, lubrication levels, and controller diagnostics.
Warning: This inspection requires trained personnel with PPE!
Cover mounting bolts tightened
External main bolts checked
Mechanical stopper checked
Adjustable mechanical stopper checked
Spatters cleaned
Dust cleaned
Robot Arm
Add or drag pictures
Sign off on the inspection
Click here to sign