Mixer 1-5 Removal from Anaerobic Digesters Preventive Maintenance
This procedure details the safe and efficient removal of Mixers 1-5 from the anaerobic digesters for maintenance or replacement. It includes necessary lockout/tagout steps, equipment disconnection, and extraction protocols to ensure safety and prevent damage to the system.
Mixer 1-5 Removal from Anaerobic Digesters Preventive Maintenance
This procedure details the safe and efficient removal of Mixers 1-5 from the anaerobic digesters for maintenance or replacement. It includes necessary lockout/tagout steps, equipment disconnection, and extraction protocols to ensure safety and prevent damage to the system.
Purpose
Ensure a safe and efficient method for removal of submersible mixers from the anaerobic digesters.
Scope
This work order outlines the safe and efficient method of removing mixers 1 thru 5 from MCR anaerobic digesters
Responsibilities
- Maintenance Technician: Follow the procedure as outlined. Raise any concerns or deviations from the procedure.
- Director of Operations: Verify completion and accuracy of the maintenance task.
Safety Precautions
PPE
Required Tools & Materials
Tools
Procedure
Digester Mixers 1-5 (Hatches) Replacement (SOP #LF001-020)
Source: LF Bioenergy - LF15 (Community Member)