PM Inspection Step 2 mesin Cut Saw (every 3 months)

This procedure is for checking the machine for loose or missing fasteners and that all parts are secure to avoid injury.
Maintenance SRP
05/27/2022

PM Inspection Step 2 mesin Cut Saw (every 3 months)

6 steps
This procedure is for checking the machine for loose or missing fasteners and that all parts are secure to avoid injury.
  • Electrical

  • Fungsional Instrument Panel Control

  • Kondisi Visual dan Fungsional Komponen Listrik

  • Kelistrikan Motor

  • Mechanical

  • Bearing Sliding

    • Pass
    • Flag
    • Fail
  • Sliding

    • Pass
    • Flag
    • Fail
  • Motor Bearing

    • Pass
    • Flag
    • Fail
Source: Maintenance SRP (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.