WW PM Weekly All Equipment Operator
This is the weekly PM for all WW equipment by the WW operator. Does not include DAF or Filter Press.
WW PM Weekly All Equipment Operator
This is the weekly PM for all WW equipment by the WW operator. Does not include DAF or Filter Press.
Food Safety Pre-Check
EQ Tank Blower & Air Flow Meter
Record the intake filter maintenance gauge. If gauge reads -30 or greater, submit a corrective WO request to inspect, replace the air filter.
Meter name
Unit
Record the differential gauge.
Meter name
Unit
Inspect the oil level on the front glass.
Inspect discharge assembly and hood (cover).
Record the air flow meter. Measurement is the reading at the top of the float.
Meter name
Unit
Inspect the air flow meter.
Coagulant Pump, Tank & Assembly
Inspect the pump CP-1.
Inspect the tank and plumbing.
Clay & Flocculant Pumps, Tanks, and Assemblies
Inspect the pumps, motors, mixers.
Inspect the gearboxes.
Inspect the tanks and plumbing.
Sludge Pumps, Tank, and Assemblies
Inspect the DAF-Sludge and Sludge-Press pumps 4 and 5.
Inspect the tank and plumbing.
Water Pumps, Plumbing Assemblies
Inspect EQ-DAF flow meter and assembly.
Inspect DAF-City pumps 6 and 7.
Inspect Pit-EQ pumps 8 and 9.
Inspect EQ-DAF pumps 2 and 3.
Inspect Shaker - Pits - Reclaimer flow meter and assembly.
Inspect Washer-Shaker and Pits-Reclaimer pumps 5, 6, 7.
Source: 087 (Community Member)