This procedure is used to keep the tank’s air pre-charge at the correct pressure so the bladder is protected, pump cycling is reduced, and the tank lasts longer.
Tanmiyat Al-Ula for Operations and Maintenance
03/25/2026

Checking and Adjusting the Air Pre-Charge in a Bladder Pressure Tank

This procedure outlines how to check and adjust the air pre-charge pressure in a bladder-type water pressure tank. It guides the technician through shutting off power, draining the tank, measuring and adjusting the pre-charge, verifying the pressure, restoring the system, and running final checks for noise, leaks and pump short-cycling.

    Turn off the power to the pump at the breaker or disconnect switch. Verify the pump does not start.

    Open a faucet or hose bib closest to the pressure tank (or the tank’s drain valve if equipped). Allow water to flow until it stops completely and no more water comes out. Leave the faucet open during the entire procedure. This ensures the bladder is fully deflated and the air pressure reading reflects only the pre-charge.

    Press the tire pressure gauge firmly onto the valve stem and read the pressure. Record the value. If water sprays out → bladder is ruptured; stop and replace the tank. If no air pressure registers and the tank feels waterlogged → bladder may be damaged.

    To add air: Connect the air compressor hose (or hand pump) to the valve and add air in short bursts. Check the pressure frequently with the gauge until it reaches the target (2 psi below cut-in). To release air: Press the center pin on the valve stem with a small screwdriver or valve tool to release air slowly. Recheck until the correct pressure is reached. Perform the adjustment at ambient room temperature for accuracy.

    Recheck with the gauge after adjustment. The reading should be stable at the target value with the faucet still open.

    Replace the protective cap on the air valve. Close the faucet or drain valve. Turn the power back on to the pump. Allow the pump to cycle on and off 2–3 times while monitoring the system pressure gauge to confirm normal operation.

    Listen for unusual noises. Check for leaks around the tank and connections. Confirm the pump is not short-cycling. Record the date, measured pre-charge before/after adjustment, and any observations in the maintenance log or in the comments section of the work order.

Source: Tanmiyat Al-Ula for Operations and Maintenance (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.