JP-PC-HVAC-FILTER-QTR

This quarterly maintenance procedure covers HVAC filter checks and replacement to support efficient system operation and consistent air quality.
GCR - Panama City
10/09/2026

JP-PC-HVAC-FILTER-QTR

This procedure outlines the quarterly HVAC filter replacement activities at Naval Support Activity Panama City, ensuring compliance with a formal Filter Management Program. It includes steps for inspection, safety, filter removal and installation, equipment condition assessment, documentation, and reporting. The procedure supports management reporting and captures necessary information for weekly and detailed touch reports, ensuring quality oversight and executive visibility.

    Preliminary Inspection and Safety

    Conduct preliminary visual inspection of equipment and work area

    • Pass
    • Flag
    • Fail

    Evaluate job hazards and implement required safety controls

    • Pass
    • Flag
    • Fail

    Coordinate with facility personnel when equipment shutdown is required

    • Yes
    • No
    • N / A

    Secure equipment using applicable lockout/tagout procedures when required

    • Yes
    • No
    • N / A

    Filter Removal and Inspection

    Remove existing filter(s)

    • Pass
    • Flag
    • Fail

    Inspect removed filter condition and document any unusual contamination, moisture, biological growth, damage, excessive dirt loading, or abnormal conditions

    Cleaning and Installation

    Clean filter compartment and accessible surfaces

    • Pass
    • Flag
    • Fail

    Install replacement filter(s) in accordance with manufacturer recommendations

    • Pass
    • Flag
    • Fail

    Verify filter is properly seated and secured

    Filter marked with installation date and technician initials?

    Equipment Inspection and Documentation

    Inspect accessible equipment condition while unit is open

    • Pass
    • Flag
    • Fail

    Document deficiencies and recommendations including: Dirty coils, Water intrusion, Damaged belts, UV light failures, Broken access doors, Corrosion, Electrical concerns, Excessive vibration, Operational concerns

    Capture photographs of installed filters and any deficiencies as appropriate

    Add or drag pictures

    Return to Service and Verification

    Return equipment to service

    • Pass
    • Flag
    • Fail

    Verify equipment is operating normally

    • Pass
    • Flag
    • Fail

    Documentation and Reporting

    Complete filter change documentation

    • Pass
    • Flag
    • Fail

    Update the Government CMMS or maintenance management system as required by contract

    • Pass
    • Flag
    • Fail

    Verify all required asset information is recorded including

    Post-Procedure Cleanup

    Clean work area and properly dispose of removed filters

    • Pass
    • Flag
    • Fail

    Comments and Deficiency Reporting

    Comments

    Deficiency Reporting

    Corrective Actions Recommended

Source: GCR - Panama City (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.