Back

Weekly Fire Alarm Test

The weekly tests need to include checks that the following devices have been triggered and then successfully reset, where applicable: Panel Indicators, Sounders, Beacons, Fire/Smoke Dampers, Speed Gate Turnstiles, Door Releases, Lifts, Boilers, Fly Tower Smoke Vents, Atrium Roof Lights, Signal Received by Central Monitoring. (Associated Documents: Fire Alarm Testing Procedures and Fire Alarm Call Point List)
Mountview
03/07/2024

Weekly Fire Alarm Test

The weekly tests need to include checks that the following devices have been triggered and then successfully reset, where applicable: Panel Indicators, Sounders, Beacons, Fire/Smoke Dampers, Speed Gate Turnstiles, Door Releases, Lifts, Boilers, Fly Tower Smoke Vents, Atrium Roof Lights, Signal Received by Central Monitoring. (Associated Documents: Fire Alarm Testing Procedures and Fire Alarm Call Point List)

    Name of Tester(s)

    Test Date

    Prior to Testing

    Monitoring Station Disabled

    • Yes
    • No
    • N / A

    Date and Time of Monitoring Testing

    Length of Monitoring Disablement

    Have colleagues been informed that the test will be commencing shortly?

    • Yes
    • No
    • N / A

    Fire Alarm Panel

    Which Fire Alarm Panel will be used during testing?

    Any Faults on the Fire Alarm Panel?

    • Yes
    • No
    • N / A

    Picture of Alarm Panel

    Add or drag pictures

    Comments

    Theatre Isolation Keys Activated?

    • Yes
    • No
    • N / A

    If Yes, which areas?

    Fire Alarm Call Point

    Call Point Asset ID

    Call Point Asset Location

    Picture of Call Point

    Add or drag pictures

    Call Point Activated Alarm

    • Yes
    • No
    • N / A

    Call Point Reset to Normal

    • Yes
    • No
    • N / A

    Sounders (Audible Alarms)

    Comments: (State all Heard and Quiet areas)

    Beacons (Visual Alarms)

    Comments: (State all Visual and Non Visual areas)

    Fire Smoke Dampers

    Did Fire Smoke Dampers Activated on Alarm?

    • Yes
    • No
    • N / A

    Fire Smoke Dampers Restored to OPEN:

    • Yes
    • No
    • N / A

    Speedgate (Turnstiles)

    Did Left Gate (Student Services) open?

    • Yes
    • No
    • N / A

    Did Centre Gate open?

    • Yes
    • No
    • N / A

    Did Right Gate (DDA/Wide Lane) open?

    • Yes
    • No
    • N / A

    Comments:

    Access Control (Salto)

    Did Salto Doors deactivate during testing?

    • Yes
    • No
    • N / A

    Comments:

    Door Holders

    Did Door Holders release and doors close during Fire Alarm?

    • Yes
    • No
    • N / A

    Comments:

    Automatic Doors

    Do Foyer DDA Auto Doors open automatically?

    • Yes
    • No
    • N / A

    Do the Automatic Doors on Stairwell 2 remain closed and powered down to allow free flow access?

    • Yes
    • No
    • N / A

    Lifts

    Lift 1 (Left Hand Passenger)

    ALL LIFTS RETURN TO GROUND AND DOORS OPEN, UNLESS FIRE ALARM IS SET OFF ON GROUND AND WILL DEFAULT TO LEVEL ONE

    • Yes
    • No
    • N / A

    Lift 2 (Right Hand Passenger)

    ALL LIFTS RETURN TO GROUND AND DOORS OPEN, UNLESS FIRE ALARM IS SET OFF ON GROUND AND WILL DEFAULT TO LEVEL ONE

    • Yes
    • No
    • N / A

    Lift 3 (Goods Lift)

    ALL LIFTS RETURN TO GROUND AND DOORS OPEN, UNLESS FIRE ALARM IS SET OFF ON GROUND AND WILL DEFAULT TO LEVEL ONE

    • Yes
    • No
    • N / A

    Lift 4 (Studio Block)

    ALL LIFTS RETURN TO GROUND AND DOORS OPEN, UNLESS FIRE ALARM IS SET OFF ON GROUND AND WILL DEFAULT TO LEVEL ONE

    • Yes
    • No
    • N / A

    Smoke Vents

    Did the Mack Theatre North Vent Open?

    • Yes
    • No
    • N / A

    Did the Mack Theatre South Vent Open?

    • Yes
    • No
    • N / A

    Did the Atrium West Side Vents Open?

    • Yes
    • No
    • N / A

    Did the Atrium East Side Vents Open?

    • Yes
    • No
    • N / A

    Did the Stairwell 1 Vent Open?

    • Yes
    • No
    • N / A

    Did the Stairwell 2 Vent Open?

    • Yes
    • No
    • N / A

    Boilers and Plant

    Did the Gas Supply system activate?

    • Yes
    • No
    • N / A

    Did Boiler 1 gas isolation valve activate and Boiler Shutdown?

    • Yes
    • No
    • N / A

    Did Boiler 2 gas isolation valve activate and Boiler Shutdown?

    • Yes
    • No
    • N / A

    Did Boiler 3 gas isolation valve activate and Boiler Shutdown?

    • Yes
    • No
    • N / A

    Did Boiler 4 gas isolation valve activate and Boiler Shutdown?

    • Yes
    • No
    • N / A

    Did all other Plant/Machinery shutdown? Such as Air Handling Units if observed

    • Yes
    • No
    • N / A

    Radios

    Did Digital Radios received the alarm signal?

    • Yes
    • No
    • N / A

    Refuge Points

    Refuge Point Asset ID

    Refuge Point Location

    Picture of Refuge Point Call Point

    Add or drag pictures

    Call Point and Receiver was able to communicate clearly?

    • Yes
    • No
    • N / A

    Completion

    I agree that all the above testing in complete and recorded accurately

    • Yes
    • No
    • N / A

    Signature

    Click here to sign
Source: Mountview (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.