Back

BUNN iMIX® Hot Beverage System Biannual Inspection

The BUNN iMIX® Hot Beverage System Biannual Inspection Form offers a straight-forward list of parts that need inspecting.
MaintainX
04/26/2021

BUNN iMIX® Hot Beverage System Biannual Inspection

10 steps
The BUNN iMIX® Hot Beverage System Biannual Inspection Form offers a straight-forward list of parts that need inspecting.
  • Check and/or replace every 6 months or as required.

  • Mixing Chamber Kit (Includes all items below)

    • Pass
    • Flag
    • Fail
  • Steam Collector OK

    • Pass
    • Flag
    • Fail
  • Mixing Chamber OK

    • Pass
    • Flag
    • Fail
  • Whipper Chamber OK

    • Pass
    • Flag
    • Fail
  • Dispense Tip OK

    • Pass
    • Flag
    • Fail
  • O-ring OK

    • Pass
    • Flag
    • Fail
  • Frother OK

    • Pass
    • Flag
    • Fail
  • Shaft Seal OK

    • Pass
    • Flag
    • Fail
  • Receptacle OK

    • Pass
    • Flag
    • Fail
  • Elbow OK

    • Pass
    • Flag
    • Fail
Source: Bunn