MTN 055 Risk Assessments and Method Statements (RAMS) Checklist for External Contractors
This procedure is used to check that contractor RAMS are complete, suitable, and actually followed so external work is carried out safely and in line with site and legal requirements.
MTN 055 Risk Assessments and Method Statements (RAMS) Checklist for External Contractors
This procedure outlines the review of Risk Assessments and Method Statements (RAMS) submitted by external contractors, using a Yes/No/N/A checklist covering timeliness, relevance to the planned work, site-specific hazards, risk ratings, control measures, and implementation. It guides the assessor through recording the contractor details, uploading the RAMS, adding comments, and confirming the work area is clean with a signature and date.
Contractor Information
Company Name
Contractor name:
Date:
RISK ASSESSMENTS AND METHOD STATEMENTS (RAMS) CHECKLIST
You should be able to answer ‘Yes’ to the following:
Are the RAMS provided in a prompt and timely manner?
Do they cover the actual work that is planned?
Do they take account of hazards that are specific to your site/location/activities?
Do they deal with hazards to all affected – not just those doing the work?
In their risk ratings, are the assessments of ‘likelihood’ and ‘severity’ realistic?
Are the control measures sensible and specific (avoiding vague generalities such as ‘suitable PPE will be worn’)?
Are copies of the RAMS provided to those directly involved in doing the work?
Are the planned and promised precautions actually implemented?
Comments:
Upload Rams Here
Add or drag pictures
Confirmation:
Assessor's Name
Click here to sign
Date confirmed