Back

FORM 2A-01-PILING

QUALITY INSPECTION FORM FOR PILING WORKS
MMX
05/31/2023

FORM 2A-01-PILING

QUALITY INSPECTION FORM FOR PILING WORKS

    Project Name:

    Block & PTD No:

    1. Before Piling

    Inspection Date:

    1.1 Piles Materials

    1.1.1 Piles Materials

    Approved Grade

    • Yes
    • No
    • N / A

    Approved Supplier

    • Yes
    • No
    • N / A

    Production Date

    • Yes
    • No
    • N / A

    At least 28 days after concrete casting date

    1.1.2 Piles Sizes and Shape

    According to piling structural drawings

    • Yes
    • No
    • N / A

    1.1.3 Piles Condition

    Should not have visual exposure of groups of coarse aggregates resulting from grout leakage

    • Yes
    • No
    • N / A

    No cracks and damages

    • Yes
    • No
    • N / A

    No exposed rebar

    • Yes
    • No
    • N / A

    2. On the day of Piling

    Inspection Date

    2.1 Pile Driver Machine

    2.1.1 Size of Pile Hammer

    According to approved pile driver hammer size by structural engineer

    • Yes
    • No
    • N / A

    2.2 Pile Driving

    2.2.1 Pile Driving Alignment

    Piles must always be vertically and horizontally aligned to the piling points during pile driving.

    • Yes
    • No
    • N / A

    2.2.2 Pile Joint

    Piling joints must be butt welded in full circuit length according to approved piling plan by structural engineer

    • Yes
    • No
    • N / A

    2.2.3 Broken Piles

    Broken piles at a piling point must be recorded and replaced with a replacement piling point right beside the original piling point. Replacement pile must be approved by appointed structural engineer.

    • Yes
    • No
    • N / A

    2.2.4 Head of Pile

    Head of pile must be protected by a helmet or dolly at all times during driving.

    • Yes
    • No
    • N / A

    2.2.5 Set of Piles

    Piles must be driven to set. Piles are only considered to be set if their penetration depth after 10 consecutive blows are below the tolerance level.

    • Yes
    • No
    • N / A

    2.2.6 Dolly

    Dolly are only allowed to be used for the last pile for a piling point up to a maximum dolly penetration depth.

    • Yes
    • No
    • N / A

    2.3 Piling Tests

    2.3.1 Eccentricity Tests

    Actual piling points positions must be within tolerable distance from planned positions in piling plan by appointed structural engineer.

    • Yes
    • No
    • N / A

    Appointed structural engineer must confirm the passing or failure of these tests.

    • Yes
    • No
    • N / A

    Test Date

    2.3.2 Pile Driving Analysis (PDA) Tests

    Actual foundation bearing capacity and structural integrity must be sufficient. Appointed structual engineer must select the piles to be tested and witness the testing.

    • Yes
    • No
    • N / A

    Appointed structural engineer must confirm the passing or failure of these tests.

    • Yes
    • No
    • N / A

    Test Date

    Photo Attachment

    Add or drag pictures

    Remarks

    MDSB Representative Signature:

    Inspector:

    Clerk of Work:

    Click here to sign
Source: MMX (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.