Ingersoll UP6S 11-22 kW Oil-Flooded Rotary Screw Compressors (UP Series): Routine Maintenance
This procedure ensures that the following are checked accordingly so your equipment performs at its best for a long period of time: Pressure Relieve Valve, Tank Drain Valve, Pressue Switch, to name a few
Ingersoll UP6S 11-22 kW Oil-Flooded Rotary Screw Compressors (UP Series): Routine Maintenance
6 steps
This procedure ensures that the following are checked accordingly so your equipment performs at its best for a long period of time: Pressure Relieve Valve, Tank Drain Valve, Pressue Switch, to name a few
COOLANT CHANGE PROCEDURE
It is better to drain the coolant immediately after the compressor has been operating as the liquid will drain more easily and any contaminant will still be in suspension.
COOLANT FILTER CHANGE PROCEDURE
AIR FILTER ELEMENT CHANGE PROCEDURE
SEPARATOR CARTRIDGE CHANGE PROCEDURE
COOLER CLEANING PROCEDURE
BELT CHANGE / GAS STRUT CHANGE PROCEDURE