Ingersoll UP6S 11-22 kW Oil-Flooded Rotary Screw Compressors (UP Series): Routine Maintenance

This procedure ensures that the following are checked accordingly so your equipment performs at its best for a long period of time: Pressure Relieve Valve, Tank Drain Valve, Pressue Switch, to name a few
MaintainX
05/03/2021

Ingersoll UP6S 11-22 kW Oil-Flooded Rotary Screw Compressors (UP Series): Routine Maintenance

6 steps
This procedure ensures that the following are checked accordingly so your equipment performs at its best for a long period of time: Pressure Relieve Valve, Tank Drain Valve, Pressue Switch, to name a few
  • COOLANT CHANGE PROCEDURE

  • It is better to drain the coolant immediately after the compressor has been operating as the liquid will drain more easily and any contaminant will still be in suspension.

  • COOLANT FILTER CHANGE PROCEDURE

  • AIR FILTER ELEMENT CHANGE PROCEDURE

  • SEPARATOR CARTRIDGE CHANGE PROCEDURE

  • COOLER CLEANING PROCEDURE

  • BELT CHANGE / GAS STRUT CHANGE PROCEDURE

    Screenshot2021-03-24at11.10.27AM.png

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.