Back

Cleaver Brooks ClearFire®-LC 750-363 Maintenance

MaintainX
04/26/2021

Cleaver Brooks ClearFire®-LC 750-363 Maintenance

35 steps
  • Caution: Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation.Failure to do so may result in equipment failure.

  • ! Caution: Verify proper operation after servicing. Failure to do so may result in equipment failure.

  • On an annual basis the boiler vessel and burner combustion system must be checked and cleaned. This work is to be carried out by an authorized Cleaver-Brooks Service Technician.

  • DISASSEMBLY FOR INSPECTION

  • Disconnect:

  • 1.PNG
  • Caution: Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing.

  • Front Fireside Access

  • Rear Fireside Access

  • REASSEMBLY

  • IGNITION AND FLAME DETECTION SYSTEMS

  • Ignition Electrode

  • Figure 5-1 Electrode spacing CFLC

  • Pilot and UV Scanner

  • Maintenance of the UV scanner consists of periodic inspection and cleaning.

  • Figure 5-2 Figure 5-2

  • Figure 5-3

Source: Cleaver Brooks

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.