Back

New Asset Acquisition Protocol

This procedure ensures that a newly acquired truck meets all necessary DOT requirements, is properly marked with company identification, and is operationally ready for fleet use in a construction company. It includes checks for essential safety and compliance items, verification of company markings, and an assessment of the truck's readiness for use.
Milmar Buildings Takeuchi Trackloader pm
07/07/2025

New Asset Acquisition Protocol

This procedure ensures that a newly acquired truck meets all necessary DOT requirements, is properly marked with company identification, and is operationally ready for fleet use in a construction company. It includes checks for essential safety and compliance items, verification of company markings, and an assessment of the truck's readiness for use.

    Equipment Outfit

    List of equipment that should be issued to each truck

    Every truck

    Ensure the truck has the following items

    Foreman Truck - Generally F-250s or F-350s

    Ensure the truck has these following items

    Superintendent Truck - Generally F-150s

    Ensure the truck has these following items

    Company Identification

    Is the company name clearly marked on both sides of the truck?

    • Yes
    • No
    • N / A

    Are the USDOT numbers clearly marked on both sides of the truck?

    • Yes
    • No
    • N / A

    Operational Readiness

    Function Test

    Engine preformance

    Test engine performance (smooth startup, no unusual noises or smoke)

    • Pass
    • Flag
    • Fail

    Brakes

    • Pass
    • Flag
    • Fail

    Steering and Suspension Operate Properly

    • Pass
    • Flag
    • Fail

    Check all Fluids

    Engine oil, coolant, transmission fluid, brake fluid, and washer fluid levels

    • Pass
    • Flag
    • Fail

    Assess Tire Condition

    Proper tread depth, no signs of wear/damage, correct inflation pressure

    • Pass
    • Flag
    • Fail

    Inspect Lights

    Headlights, taillights, brake lights, turn signals, and hazard lights must be fully functional

    • Pass
    • Flag
    • Fail

    Check HVAC System

    • Pass
    • Flag
    • Fail

    Additional Items

    Check Special Equipment

    Such as toolboxes, ladders, or storage compartments for secure mounting and functionality

    • Pass
    • Flag
    • Fail

    Describe any issues found during the inspection

    Date Completed

    Inspector's signature

    If ALL fields are not met, the truck is NOT ready to send out!

    Click here to sign
Source: Milmar Buildings Takeuchi Trackloader pm (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.