Back

SUNGROW PV System Preventive Maintenance Procedure (Monthly, Quarterly & Semi-Annual)

This procedure defines the preventive maintenance activities required for Sungrow PV systems, including inverters, battery energy storage systems, transformers, switchgear, combiner boxes, SCADA, weather stations, vegetation, and site infrastructure. It ensures equipment reliability, safety compliance, performance monitoring, and proper documentation through structured monthly, quarterly, and semi-annual inspections.
GEE TEE ELECTRICAL
12/18/2025

SUNGROW PV System Preventive Maintenance Procedure (Monthly, Quarterly & Semi-Annual)

This procedure defines the preventive maintenance activities required for Sungrow PV systems, including inverters, battery energy storage systems, transformers, switchgear, combiner boxes, SCADA, weather stations, vegetation, and site infrastructure. It ensures equipment reliability, safety compliance, performance monitoring, and proper documentation through structured monthly, quarterly, and semi-annual inspections.
Procedure Max Score: 149

    1.PV INVERTERS

    Monthly – External Inspection

    Monthly – Internal Inspection

    Quarterly

    Semi-Annual

    • Pass
    • Flag
    • Fail

    2. BATTERY ENERGY STORAGE SYSTEM (BESS)

    Monthly – Environmental Readings

    Temperature

    Humidity

    Monthly – Visual Inspection

    Quarterly

    Semi-Annual

    • Pass
    • Flag
    • Fail

    3. PV INVERTERS – RUNNING STATUS

    Monthly

    Quarterly

    Semi-Annual

    • Pass
    • Flag
    • Fail

    4. TRANSFORMERS

    Monthly – Visual Inspection

    Quarterly

    Semi-Annual

    • Pass
    • Flag
    • Fail

    5. SWITCHGEAR

    Monthly

    Quarterly

    Semi-Annual

    • Pass
    • Flag
    • Fail

    6.CBX (COMBINER BOX)

    Monthly

    Quarterly

    SEMI-ANNUAL MAINTENANCE

    • Pass
    • Flag
    • Fail

    7 SCADA – HARDWARE & SOFTWARE

    Quarterly

    Monthly

    Semi-Annual

    • Pass
    • Flag
    • Fail

    8 WEATHER STATIONS & SENSORS

    Monthly

    Quarterly

    Semi-Annual

    • Pass
    • Flag
    • Fail

    9 VEGETATION & SITE INFRASTRUCTURE

    Monthly

    Quarterly

    Semi-Annual

    • Pass
    • Flag
    • Fail

    10 SAFETY & COMPLIANCE ITEMS

    Monthly

    Quarterly

    Semi-Annual

    • Pass
    • Flag
    • Fail

    11 DOCUMENTATION & REPORTING

    Monthly Report

    Quarterly Report

    Semi-Annual Report

    • Pass
    • Flag
    • Fail

    DATE:

    Technician's Signature

    Click here to sign
Source: GEE TEE ELECTRICAL (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.