JLG Vertical Mast Pecolift X: Pre-Operation Checklist

Use this checklist and inspection form at the beginning of each workshift or at each change of operator.
MaintainX
10/12/2022

JLG Vertical Mast Pecolift X: Pre-Operation Checklist

Use this checklist and inspection form at the beginning of each workshift or at each change of operator.

    Visual Inspection: Carry out a thorough visual inspection of the machine. Look specifically for any signs of damage to:

    DO NOT USE THE MACHINE if any of the above items are faulty or not working. NORMAL OPERATION Use the machine internally or externally, on hard, level surfaces sloping up to 3°, and able to support the machine and safe working load.

    Ensure a person is available at ground level to assist in case of emergency.

    DO NOT ELEVATE IF THEY ARE NOT CLOSED.

    Note: Only turn the fly-wheel handle when standing within the platform guardrails. Never operate when standing outside the guardrails, except when following the “Emergency Lowering Procedure”.

Source: MaintainX (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.