Back

LOTO Procedures

This Lock out/Tag Out procedures are to be completed before any service or maintenance work on equipment or machinery, and/or before entry into any grain bin or other area where operating equipment poses a hazard to the entrant.
MaintainX
07/26/2022

LOTO Procedures

This Lock out/Tag Out procedures are to be completed before any service or maintenance work on equipment or machinery, and/or before entry into any grain bin or other area where operating equipment poses a hazard to the entrant.

    The exact steps taken will vary some from company to company, but the basic requirements are as follows:

    Power is Disconnected

    Lock Out the Power

    Filling Out the Tag

    Holding the Key

    Restoring Power

    Creating a LOTO Program

    Any company that has potentially dangerous machinery will need to have a LOTO program developed. The steps listed above will give general guidance on how the program should be developed. The specifics regarding things like what is written on a tag, what situations the program is used, and other factors can be determined by the safety manage of the facility.

Source: MaintainX (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.