Back

Mid-Shift Walkthrough

Walk-around inspections can help ensure that your equipment is fully operational on a day to day basis to avoid the halt of operations.
Electro Cycle Maintenance
08/16/2023

Mid-Shift Walkthrough

Walk-around inspections can help ensure that your equipment is fully operational on a day to day basis to avoid the halt of operations.

    Power Supply Water Pressure,

    Meter name
    Unit

    Power Supply Water Temp

    Meter name
    Unit

    Power Supply Water Flow

    Meter name
    Unit

    Power Supply DI Reading

    Meter name
    Unit

    Furnace Upper Cable Temperature

    Meter name
    Unit

    Furnace Upper Cable Flow

    Meter name
    Unit

    Furnace Lower Cable Temperature

    Meter name
    Unit

    Furnace Lower Cable Flow

    Meter name
    Unit

    Furnace Cooling Water Pressure

    Meter name
    Unit

    Furnace DI Reading

    Meter name
    Unit

    Furnace ground level

    Meter name
    Unit

    Furnace power supply leaks

    • Pass
    • Flag
    • Fail

    Furnace spider wire

    • Pass
    • Flag
    • Fail

    Cooling Tower Water DI (1250 or below)

    Meter name
    Unit

    Baghouse Main ID Amps

    Meter name
    Unit

    Baghouse Main ID Setpoint

    Meter name
    Unit

    Baghouse Differential Pressure

    Meter name
    Unit

    Baghouse Inlet Temperature

    Meter name
    Unit

    Baghouse Outlet Temperature

    Meter name
    Unit

    Kiln Water Column Reading

    Meter name
    Unit

    Kiln position

    Evap Skid Primary Water Pressure

    Meter name
    Unit

    Evap Skid Secondary Water Pressure

    Meter name
    Unit

    Evap Skid Air Pressure Primary

    Meter name
    Unit

    Evap Skid Air Pressure Secondary

    Meter name
    Unit

    IR Air Dryer

    • Pass
    • Flag
    • Fail

    Sullair Air Dryer

    • Pass
    • Flag
    • Fail

    Dual Shear Outboard Bearing (5 shots of grease each)

    • Yes
    • No
    • N / A

    #1 Mill Grease Outboard Bearings (15 shots each)

    • Yes
    • No
    • N / A

    Kiln Airlock-Check for Jamming or Build Up of Material

    • Pass
    • Flag
    • Fail

    FCE Hydraulics (Basement)

    • Pass
    • Flag
    • Fail
Source: Electro Cycle Maintenance (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.