Bi-Monthly Mobi Site Inspection
A bi-monthly inspection of the Mobi site to systematically evaluate structural condition, equipment functionality, safety systems, and regulatory compliance, ensuring all identified deficiencies are promptly documented and addressed to maintain a safe, fully operational, and compliant site environment.
Bi-Monthly Mobi Site Inspection
This procedure provides the steps required to inspect and verify the operational condition of a Mobi site and its critical equipment during scheduled inspections. One inspection should be conducted remotely and one should be performed as a physical on-site visit each month, with findings documented using photos and observations.
Procedure Max Score: 53
Date
Site Name
Borehole Pump VFD
Media Filters
Raw water pump
Micron Filters
Main Spectra Controls
Attach photo of the feed pressure gauge while the system is running.
Add or drag pictures
Attach photo of the high pressure gauge while the system is running.
Add or drag pictures
Attach a photo of the raw water and product flow tubes while the system is running.
Add or drag pictures
Attach photo of the brine pressure gauge.
Add or drag pictures
KB Genesis Controller
Use the power and status LEDs
Pearson Pumps
Any Other Observations?
Spectra Sensors
Attach photo of the alarms/ sensors page.
Add or drag pictures
Inverters
Powerwalls
Attach photo of the grid forming page of the powerwalls.
Add or drag pictures
Generation and Distribution Panel
Attach a photo of generation breakers in Tesla Gateway.
Add or drag pictures
Attach a photo of the distribution panel.
Add or drag pictures
Product and Raw Water Tanks.
Network Equipment
Distribution pumps & VFD
Chemical Dosing Pumps
Plumbing Network
Soakpit, Injection Well & Washrooms
Metallic Structures ,Walls & Others
Section #19
List of Items (Procurement items)
List of Pending Maintenance Items.
Source: Give Power (Community Member)
