DMG Bi-Weekly Preventive Maintenance
This checklist outlines the bi-weekly preventive maintenance tasks for the DMG machine to ensure optimal performance and reduce the risk of breakdowns. This includes inspecting mechanical and electrical components, cleaning, lubrication, and addressing any minor issues before they escalate.
DMG Bi-Weekly Preventive Maintenance
Procedure Max Score: 17
Remove Door covers check hardware is tight and chips are cleaned out.
Check alignment of door switches
Check door shutterdoor hardware is tightened weekly
Clean inside machine out
Check spring stops on fixturing for damage.
Clean around tool shutter and tweezers.
Whip down magnet base on back of the machine.
Check all fluid levels, spindle coolant, hydraulic fluid, spindle lube, and way lube.