Back

WW PM 12-Month Clay Assembly -- Tank, Eductor, Cylinder T-3 / CC-2 / CE-1

The 12-Month PM for the Clay Assembly—Tank, Eductor, Cylinder T-3 / CC-2 / CE-1—helps maintain proper clay flow, ensures efficient mixing and suction performance, and prevents buildup that can cause system blockages. This annual maintenance reduces wear on components, identifies early signs of failure, improves system reliability, and minimizes costly downtime while supporting consistent, safe operation of the entire clay processing system.
087
05/09/2025

WW PM 12-Month Clay Assembly -- Tank, Eductor, Cylinder T-3 / CC-2 / CE-1

The 12-Month PM for the Clay Assembly—Tank, Eductor, Cylinder T-3 / CC-2 / CE-1—helps maintain proper clay flow, ensures efficient mixing and suction performance, and prevents buildup that can cause system blockages. This annual maintenance reduces wear on components, identifies early signs of failure, improves system reliability, and minimizes costly downtime while supporting consistent, safe operation of the entire clay processing system.

    Food Safety Pre-Check

    Food Safety Post-Check

Source: 087 (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.