Back

Monthly Bi-Seal Line Preventive Maintenance

This procedure covers the monthly maintenance inspection of the Bi-Seal Line, including the feeder bowl, vibrators, air lines, feed wheel, drive mechanism, safety guards, and electrical panel.
H.B Fuller Co. - Northbrook IL
02/04/2026

Monthly Bi-Seal Line Preventive Maintenance

This procedure outlines the monthly maintenance tasks for inspecting and ensuring the proper functioning of various components of the Bi-Seal Line, including the feeder bowl, vibrators, air lines, feed wheel, drive mechanism, safety guards, electrical panel.

    Feeder Bowl Inspection

    Inspect the Feeder Bowl for Cracks to prevent leakage

    • Pass
    • Flag
    • Fail

    Vibrators Check

    Check that the Vibrators are working correctly

    • Pass
    • Flag
    • Fail

    Air Lines and Regulators Inspection

    Inspect the Air lines and regulators for any replacements needed

    • Pass
    • Flag
    • Fail

    Feed Wheel and Line Belt Condition

    Check the condition of the Feed wheel and Line belt

    • Pass
    • Flag
    • Fail

    Recommend replacements if in poor condition

    • Yes
    • No
    • N / A

    Drive Mechanism and Applicator System Inspection

    Inspect the condition of the Drive mechanism for the belt and the Applicator system

    • Pass
    • Flag
    • Fail

    Inspect all fasteners (bolts and nuts) for strength

    • Pass
    • Flag
    • Fail

    Inspect the Drive tensioning and Integrity

    • Pass
    • Flag
    • Fail

    Machine Safety Guards Check

    Check the integrity of the machine safety guards

    • Pass
    • Flag
    • Fail

    Main Electrical Panel Inspection

    Inspect the Main Electrical Panel

    • Pass
    • Flag
    • Fail

    Check the Line for exposed/burnt wiring

    • Pass
    • Flag
    • Fail

    Inspect the Condition of the Conveyor System & Air Tunnel

    Check tightness of bolts in sequence opposite each other

    • Pass
    • Flag
    • Fail

    Check tightness of nuts in a sequence opposite each other

    • Pass
    • Flag
    • Fail

    Belts, material integrity

    • Pass
    • Flag
    • Fail

    Inspect the Induction Heater

    Check for Leaks, and repair, if any

    • Pass
    • Flag
    • Fail

    Clean and inspect the element or replace with a new element. “Cleaning Primary Filter Element”.

    • Pass
    • Flag
    • Fail

    Blow down Dust and any impurities. Cover and tighten the cover latches.

    • Pass
    • Flag
    • Fail

    Check the screen Display & Listen for unusual noises

    • Pass
    • Flag
    • Fail

    Clean the mounting base for the Unit and check all Inlet and Outlet ports

    • Pass
    • Flag
    • Fail

    Remove pipe plugs from the tees to check cross-connecting piping is clean and free of obstructions.

    • Pass
    • Flag
    • Fail
Source: H.B Fuller Co. - Northbrook IL (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.