Back

CHAINSAW REPAIR SERVICE INCIDENT INSPECTION CHECKLIST

Use this checklist to help you with all the processes of documenting all worksite injuries, near misses​, and accidents after an incident.
MaintainX
09/16/2022

CHAINSAW REPAIR SERVICE INCIDENT INSPECTION CHECKLIST

Use this checklist to help you with all the processes of documenting all worksite injuries, near misses​, and accidents after an incident.

    Date:

    Time:

    INCIDENT NAME:

    INCIDENT NUMBER:

    RESOURCE #: E-

    COMPANY/CONTRACTOR:

    AGREEMENT NUMBER:

    VIN #:

    LICENSE PLATE, STATE/#:

    LEAD MECHANIC NAME:

    EQUIPMENT and REQUIREMENTS – CHAINSAW REPAIR SERVICE

    Minimum Requirements Yes No --- Not all inclusive; for additional clarification refer to agreement

    Agreement: One complete copy. Note, must have arrived at incident with at least 1 complete copy

    • Yes
    • No
    • N / A

    Check-In Process: Completed (Note: Also includes; Finance, and Plans)

    • Yes
    • No
    • N / A

    Resource(s) on Contract/Agreement and Resource Order matches resource(s) assigned to incident.

    • Yes
    • No
    • N / A

    Additional Mechanic Name(s):__

    Incident Pre-Use Inspection (OF-296 Vehicle/Heavy Equipment Mechanical Inspection): This Vehicle has successfully completed a Mechanical Inspection for this Incident

    • Yes
    • No
    • N / A

    Fully Self Contained Unit: Sufficient size with protective covering to perform all duties in all types of weather conditions

    • Yes
    • No
    • N / A

    Power Source: AC power source (i.e. generator, quite type) that is adequate to provide sufficient power for all onboard and external systems (with a decibel rating no greater than 68 at 50 feet) with extension cords and spyder box(s)

    • Yes
    • No
    • N / A

    All necessary fuel (the Contractor is authorized to purchase fuel from the fuel vendor if provided at the incident

    • Yes
    • No
    • N / A

    Customer Service Area: Provide adequate covered customer service area, with a minimum of (2) 6 ft. folding tables or equivalent

    • Yes
    • No
    • N / A

    Lighting: Sufficient to provide light in all entrance ways, work areas, including customer service area(s)

    • Yes
    • No
    • N / A

    Parts Cleaner: Self-contained

    • Yes
    • No
    • N / A

    Air compressor with tools and attachments

    • Yes
    • No
    • N / A

    Chain Breaker Tool (bench mounted) and Chain Rivet Spinner

    • Yes
    • No
    • N / A

    Chain Grinder(s): Electric

    • Yes
    • No
    • N / A

    Chain: 1,000 feet. Chain must be compatible with STIHL and Husqvarna

    • Yes
    • No
    • N / A

    Parts Inventory: Must maintain sufficient amounts of commonly used inventory - chainsaw/portable pump parts, and accessories, which will meet incidents needs

    • Yes
    • No
    • N / A

    Tools: Appropriate chain saw & portable pump repair tools

    • Yes
    • No
    • N / A

    Contractor provided tracking log: Documentation sheets will include: name of the individual requesting service, the name of the resource, type of resource (i.e. crew, engine, faller (module), resource order number, and brief description of work to be done, and signature block.

    • Yes
    • No
    • N / A

    Customer Receipts: Provides customer receipt(s) at time of drop off

    • Yes
    • No
    • N / A

    Ability to accept credit cards from other contracted vendors for on-site purchasing of inventory parts needed for repairs of equipment to any contracted vendor resources assigned to the Incident

    • Yes
    • No
    • N / A

    Maintain itemized invoicing records for all parts and labor cost associated with contracted resources needing repaired and/or serviced. The invoices must include the name of the individual requesting service, the name of the contracted resource, type of resource (i.e. crew, engine, faller module), resource order number, and brief description of work that was completed.

    • Yes
    • No
    • N / A

    Maintain invoicing and payment records for all parts and accessories that were provided for the repair of Agency/Government equipment in support of the current incident.

    • Yes
    • No
    • N / A

    Reconciling all invoices with incident finance on a regular/daily basis

    • Yes
    • No
    • N / A

    Be open daily for receipt, pickup, and repair of equipment during peak service times as directed by the Supply Unit Leader. Peak service times generally are from 0530-0900 and 1800-2200.

    • Yes
    • No
    • N / A

    Inspector

    Click here to sign

    Date:

    Contractor:

    Date:

    Inspector:

    Date:

    REMARKS:

Source: MaintainX (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.