Back

Milnor Pony Dryer Monthly PM

Preventive Maintenance is the act of performing regularly scheduled maintenance activities to help prevent unexpected failures in the future. It involves taking necessary precautions and actions to prevent accidents or equipment failures from occurring before they happen.
67P East Buffalo NY
03/17/2024

Milnor Pony Dryer Monthly PM

Pony Dryer Monthly PM

    *** LOTO Confirmation Statement - DO NOT EDIT/REMOVE ***

    All hazardous energy has been isolated using LOTO procedures?

    All potential stored or residual energy has been relieved, disconnected, restrained, lowered, and/or otherwise rendered safe?

    Lock Out Tag Out

    LOTO Performed:

    • Yes
    • No
    • N / A

    Utilize the Cintas ENERGY CONTROL PROGRAM checklist when applying LOTO:

    • Pass
    • Flag
    • Fail

    Machine Observations

    If applicable, test fire suppression system on the pony dryer. Live electrical permit may be required.

    • Pass
    • Flag
    • Fail

    If the fire suppression does not work properly during test, the machine MUST be locked Out of Service until repaired

    • Pass
    • Flag
    • Fail

    Repairs made or needed.

Source: 67P East Buffalo NY (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.