WINTERIZATION CHECKLIST (NY)
The aim is to ensure that all equipment, systems, and facilities are properly prepared for cold weather conditions to maintain safe, efficient, and uninterrupted operations throughout the winter season. This checklist serves as a preventive measure to protect assets from freezing, corrosion, and weather-related damage by verifying that insulation, heating systems, fluids, and protective measures are in place and functioning correctly.
WINTERIZATION CHECKLIST (NY)
The aim is to ensure that all equipment, systems, and facilities are properly prepared for cold weather conditions to maintain safe, efficient, and uninterrupted operations throughout the winter season. This checklist serves as a preventive measure to protect assets from freezing, corrosion, and weather-related damage by verifying that insulation, heating systems, fluids, and protective measures are in place and functioning correctly.
Heating System PM & Cleaning Boilers
Set up boiler operation on BMS system
Check & set burners control modules ON & OIL position
Check & clean oil circulating pump & strainers
Check & lubricate water circulating heat pump (check valves)
Check that system supply & return valve are in opening position
Bleed out air on all radiators
Check & open valves to the air handler
Check & run electric duct heater
Turn off A/C @ #50 mechanical elevator room
Turn on Heaters at PGP mechanical room
Drain all outside spigot
Remove window A/C (where applicable)
Take Inventory of Winter Supplies
Conduct preventative maintenance on snow blower & salt spreader
Click here to sign
Source: CFR (Community Member)
