This monthly inspection ensures wire ropes and hooks are in safe working condition and meet required standards before continued use. Inspect for wear, damage, and proper operation, and record all measurements and results so any issues can be addressed before they become a safety risk.
Rhoads Industries
03/09/2026

Monthly Inspection Wire Rope and Hook

A monthly inspection of wire rope and hooks is a regulated safety procedure required by OSHA 1926.1413 for crane and lifting equipment to prevent catastrophic failure. It involves a documented, detailed examination by a qualified person for broken wires, severe abrasion, distortion (kinking, birdcaging), corrosion, and hook damage like throat opening or twisting.

    1. Wire Rope Inspection (Running Rope) Refer to OSHA 1910.179(m) and ASME B30.30

    Broken Wires Max 6 randomly broken wires in 1 lay OR 3 in 1 strand.

    • Pass
    • Flag
    • Fail

    Wire Structure No kinking, bird-caging, crushing, or core protrusion.

    • Pass
    • Flag
    • Fail

    Wire Diameter Must not be reduced by more than 5% from nominal.

    • Pass
    • Flag
    • Fail

    Wire End Fittings No cracks, excessive wear, or loose wire rope clips.

    • Pass
    • Flag
    • Fail

    Heat/Electric No discoloration from heat or evidence of arc strikes.

    • Pass
    • Flag
    • Fail

    Lubrication Rope is properly lubricated; no dry "valleys" or heavy rust.

    • Pass
    • Flag
    • Fail

    2. Hook Inspection Refer to ASME B30.10

    Throat Opening Max 5% increase from original (not to exceed 1/4").

    • Pass
    • Flag
    • Fail

    Twist/Bend Max 10° twist from the plane of the unbent hook.

    • Pass
    • Flag
    • Fail

    Wear Max 10% wear at the saddle or load-bearing point.

    • Pass
    • Flag
    • Fail

    Safety Latch Present, functional, and bridges the throat completely.

    • Pass
    • Flag
    • Fail

    Rotation Hook swivels freely 360° without binding or grinding.

    • Pass
    • Flag
    • Fail

    Cracks/Nicks No visible cracks; no nicks deeper than a fingernail.

    • Pass
    • Flag
    • Fail

    3. Operational & Block Check

    Upper Limit Switch Hoist stops automatically before the block hits the drum

    • Pass
    • Flag
    • Fail

    Sheaves/Drums No cracks in flanges; grooves are smooth and unworn.

    • Pass
    • Flag
    • Fail

    Markings Capacity and safety labels are legible and visible.

    • Pass
    • Flag
    • Fail

    4. Critical Measurement Data Rope Diameter

    Required Equipment: Calibrated digital calipers capable of measuring to 0.001 inch accuracy Measurement Method Step 1 – Prepare the Rope for Measurement - Position the crane so the rope section to be measured is accessible. - Ensure the rope is clean and free of heavy grease, debris, or contamination that may affect measurement accuracy. - Visually confirm there are no obvious kinks or distortions at the measurement location. Step 2 – Identify Measurement Locations Measurements shall be taken at three locations along the rope. - Location 1: Approximately 12 inches above the hook block - Location 2: Mid-span of the rope length - Location 3 : Near the drum at the first wrap These locations shall remain consistent during all future inspections to ensure accurate comparison of inspection data. Step 3 – Take Diameter Measurements At each location, perform the following: 1. Place the calipers across the crowns of the rope strands (the outermost points of the rope). 2. Take Measurement A. 3. Rotate the calipers 90 degrees around the rope. 4. Take Measurement B. Taking two measurements 90° apart accounts for rope ovality or distortion. Step 4 – Calculate the Average Diameter After obtaining Measurement A and Measurement B, calculate the average diameter for that location. Formula: Average Diameter = (A + B) ÷ 2 This calculation is performed separately for each measurement location. Recording Measurement Data Inspectors shall record: - Measurement A - Measurement B - Calculated Average Diameter This will result in three average diameter values, one for each rope location.

    Location 1: Approximately 12 inches above the hook block

    • Measurement A • Measurement B • Average Diameter

    Location 2: Mid-span of the rope length

    • Measurement A • Measurement B • Average Diameter

    Location 3: Near the Drum at the first wrap

    • Measurement A • Measurement B • Average Diameter

    Nominal Rope Diameter

    Signature Block

    Click here to sign

    Date

Source: Rhoads Industries (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.