Over Head Door Monthly PM
Inspect the cables and springs on each overhead door, record the result, and lubricate every roller.
Over Head Door Monthly PM
This procedure covers the monthly preventive maintenance of overhead doors #1-22 and the maintenance shop/plant opening overhead door. It includes inspecting cables and/or springs for damage, recording each result as PASS, FLAG, or FAIL, and lubricating every roller with Over Head Door Heavy Duty Lube.
Cable and spring
inspect cable and or spring for damage
Over head door # 1
Over head door # 2
Over head door # 3
Over head door # 4
Over head door # 5
Over head door # 6
Over head door # 7
Over head door # 8
Over head door # 9
Over head door # 10
Over head door # 11
Over head door # 12
Over head door # 13
Over head door # 14
Over head door # 15
Over head door # 16
Over head door #17
Over head door # 18
Over head door # 19
Over head door # 20
Over head door # 21
Over head door # 22
Over head door maintenance shop/plant opening
Rollers
lube each roller with Over Head Door Heavy duty lube
Source: Precision Strip - Bowling Green (Community Member)
