Building Electric Transformer PM - Every Two Year

Over time, a transformer can encounter critical issues that lead to failure and can cause problems. Regular maintenance of a transformer aims to maintain both the internal and external parts safely and minimize any transformer downtime.
087
03/17/2024

Building Electric Transformer PM - Every Two Year

Over time, a transformer can encounter critical issues that lead to failure and can cause problems. Regular maintenance of a transformer aims to maintain both the internal and external parts safely and minimize any transformer downtime.

    *** LOTO Confirmation Statement - DO NOT EDIT/REMOVE ***

    All hazardous energy has been isolated using LOTO procedures?

    All potential stored or residual energy has been relieved, disconnected, restrained, lowered, and/or otherwise rendered safe?

    Lock Out Tag Out

    LOTO Performed

    Machine Observation

    Transformers

    ENERGY CONTROL PROGRAM

    Perform LOTO in accordance with the LOTO risk assessment.

    • Pass
    • Flag
    • Fail

    Requirement

    This PM must be completed by a licensed electrical contractor (certified to work on commercial high voltage) and not a Cintas partner.

    • Pass
    • Flag
    • Fail

    All electrical/arc flash PPE must be used for this process.

    • Pass
    • Flag
    • Fail

    De-energize all electrical power and verify LDL before performing work.

    • Pass
    • Flag
    • Fail

    Your location should have a copy of a current building electrical drawing or a one line drawing indication the location of the panels, voltages and safety protection areas.

    • Pass
    • Flag
    • Fail

    Transformers

    After de-energizing, remove top covers and check LDL, inspect insides, inspect coils, inspect connections and insulators -remove loose dust or dirt deposits with a vacuum cleaner.

    • Pass
    • Flag
    • Fail

    Examine the transformer for signs of overheating, deterioration, arcing, loose or broken parts, or other abnormal conditions. Torque all connections to manufacturer specifications. (Appendix 4)

    • Pass
    • Flag
    • Fail

    Tighten all connections to the manufacture's specification.

    • Pass
    • Flag
    • Fail

    Service Transformer

    Verify that service transformer inspections are completed by the local power company. (Appendix 5)

    • Pass
    • Flag
    • Fail

    Requirement

    Your location should have a copy of a current building electrical drawing or a one line drawing indication the location of the panels, voltages and safety protection areas.

    • Pass
    • Flag
    • Fail

    Repair made or needed:

Source: 087 (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Global Procedure Library is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.