This procedure ensures that the generator undergoes a thorough weekly inspection covering fuel levels, oil condition, coolant levels, battery charge, transfer switch functionality, and overall mechanical integrity, maintaining reliable standby power readiness, preventing unexpected failures during power outages, and supporting consistent generator performance and compliance with applicable maintenance and safety standards.

    1.       Verify Generator is in Auto transfer

    • Pass
    • Flag
    • Fail

    2.       Emergency stop button should be in the OUT position

    • Pass
    • Flag
    • Fail

    3.       Ensure there are not any visible fluid leaks (engine, floor area)

    • Pass
    • Flag
    • Fail

    4.       Are batteries and terminals in good condition/free of corrosion, leaks

    • Pass
    • Flag
    • Fail

    5.       Are belts on pulleys properly, any visual damage to belts (cracks, tears, etc.)

    • Pass
    • Flag
    • Fail

    6.       Battery charger ON

    • Pass
    • Flag
    • Fail

    7.       Block heater ON (are hoses warm)

    • Pass
    • Flag
    • Fail

    8.       Any noticeable alarms present on the control panel

    • Pass
    • Flag
    • Fail

    9.       Check fuel levels (do not allow fuel below ½ tank before refueling)

    • Pass
    • Flag
    • Fail

    Complte steps 1-9 prior to exercising generators for 30 min.

    • Pass
    • Flag
    • Fail

    2.       30-minute generator run instructions Generator Manual Start Instructions

    • Pass
    • Flag
    • Fail

    3.       Monitor and record (in weekly inspection form) vital run info every 5 minutes during runtime

    • Pass
    • Flag
    • Fail

    Once test is complete verify generators are in Auto Transfer

    • Pass
    • Flag
    • Fail

    Close out all pagerduty tickets that were activated during the test.

    • Pass
    • Flag
    • Fail
Source: Pacificsource Springfield (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.