WW PM 12-Month EQ Tank T-1 Tec Tank

The 12-Month PM according to the Steel Tank Institute / Steel Plate Fabricators Association (STI/SPFA) for the EQ tank manufactured by Tec Tank. Quality inspection determines and verifies the quality level of the products to ensure that the results of the manufacturing process are the same as expected.
087
05/01/2025

WW PM 12-Month EQ Tank T-1 Tec Tank

The 12-Month PM according to the Steel Tank Institute / Steel Plate Fabricators Association (STI/SPFA) for the EQ tank manufactured by Tec Tank. Quality inspection determines and verifies the quality level of the products to ensure that the results of the manufacturing process are the same as expected.

    Food Safety Pre-Check

    Complete PMs.

    Inspect the tank walls, heads, and roof for coating failure, buckling, denting, or bulging, free standing water. Inspect all labels and tags are legible. If Flag or Fail, upload photo and explain in notes. Open a corrective work order.

    • Pass
    • Flag
    • Fail
    if the answer is "oneOf [FLAG,FAIL]"

    Inspect normal and emergency vents for screen coverings and no obstructions. Verify components are moving freely. If Flag or Fail, upload photo and explain in notes. Open a corrective work order.

    • Pass
    • Flag
    • Fail
    if the answer is "oneOf [FLAG,FAIL]"

    Fault found. Open a corrective work order.

    Inspect the concrete foundation and bollards for tank settlement, washout, cracking, and spalling. Inspect supports and anchors for corrosion or loose fittings. If Flag or Fail, upload photo and explain in notes. Open a corrective work order.

    • Pass
    • Flag
    • Fail
    if the answer is "oneOf [FLAG,FAIL]"

    Inspect panel / chime joints, manway covers, piping joints, gaskets, and attachment bolts for wear, damage, leaks, or corrosion. If Flag or Fail, upload photo and explain in notes. Open a corrective work order.

    • Pass
    • Flag
    • Fail
    if the answer is "oneOf [FLAG,FAIL]"

    Inspect and test the tank level transmitter for power, communication, and overfill alarm. If Flag or Fail, upload photo and explain in notes. Open a corrective work order.

    • Pass
    • Flag
    • Fail
    if the answer is "oneOf [FLAG,FAIL]"

    Inspect the tank overfill plumbing for visible leaks and cracks in connections and fittings. If Flag or Fail, upload photo and explain in notes. Open a corrective work order.

    • Pass
    • Flag
    • Fail
    if the answer is "oneOf [FLAG,FAIL]"

    Food Safety Post-Check

Source: 087 (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.