Reach Stacker 4632 Post Use Checklist
The Post-Use Checklist for Reach Stacker 4632 is a standardized procedure performed after equipment operation to ensure the machine is safely shut down, properly maintained, and ready for the next use. This checklist helps detect early signs of wear or damage, ensures safe parking conditions, and supports ongoing equipment reliability and compliance.
Reach Stacker 4632 Post Use Checklist
The Post-Use Checklist for Reach Stacker 4632 is a standardized procedure performed after equipment operation to ensure the machine is safely shut down, properly maintained, and ready for the next use. This checklist helps detect early signs of wear or damage, ensures safe parking conditions, and supports ongoing equipment reliability and compliance.
REPORT ANY DAMAGE TO SUPERVISOR IMMEDIATELY
Pre-Use Inspection
Ending Hours
Fuel
DEF Level
Clean out Cab
Shut all Windows and Doors
Keys removed
Main Disconnect Off
Comments
Signature
Click here to sign
Reach Stacker 4632 Pre Use Checklist
IF FAILURE REPORTED, CORRECTIVE ACTION HAS TO BE COMPLETED PRIOR TO USE
Pre-Use Inspection
Front of Spreader
Add or drag pictures
Back of Spreader
Add or drag pictures
Front of Machine
Add or drag pictures
Left Side of Machine
Add or drag pictures
Back of Machine
Add or drag pictures
Right Side of Machine
Add or drag pictures
Front Left Dual Tires
Front Right Dual Tires
Back Left Tire
Back Right Tire
Battery
Brake Cooling Oil
Hydraulic Oil
Engine Oil
Engine Coolant
Starting Hours
Fuel
Lights
Back Up Alarm
Signature
Click here to sign
Source: Export - Newark (Community Member)